Roadmap

What's next.

Quarter-resolution timing for the things investors, partners, and beta participants ask us about most.

Dates below are quarter-resolution targets, not contractual commitments. We will update this page if we slip a quarter — and tell you why.

Q1 2026 · Now

  • Provisional patents (Surge, Fertigation, Valve Diagnostics, Magnetic Reset) — filing in process.
  • Beta cohort hardware finalization. Firmware test suite passing end-to-end.
  • Manufacturing partner selection (off-the-shelf enclosure for wave 1).

Q2 2026 · Next

  • Beta cohort kickoff. 20–30 sites across kitchen gardens, multi-site landscape contractors, vineyards, school grounds, HOAs, and greenhouse operators.
  • FCC / IC RSS-247 certification engagement begins.
  • EPA WaterSense application package compiled.
  • Founder-direct support for the beta cohort.

Q3–Q4 2026 · Production wave 1

  • Hydro Controller (Base / Pro / Enterprise configurations) — ships.
  • Hydro Node · 4-zone — ships.
  • Accessories: Camera, Weather Station Kit, Fertigation Module, Sensor 2-Pack, Solar Battery Kit, Zone Expansion Kit — all ship in wave 1.
  • UL 916 / UL 1449 / CE certifications targeted for production launch.
  • First beta case studies published with signed releases.

H1 2027 · Wave 2

  • Hydro Node · 8-zone — ships. Larger plots, mesh-relay capable.
  • Utility-nonprovisional patent filings (12-month clock from each provisional).
  • Distributor / installer partner program launch.
  • White-label dashboard for landscape-contractor portfolios.

H2 2027 and beyond

  • Hydro Bridge and Sense Node — wireless-bridge and battery-powered sensor SKUs.
  • Custom enclosure tooling for the Hydro Controller (replacing off-the-shelf wave-1 enclosure).
  • International market certification (EU, UK, Australia).
  • Programmatic API public release for third-party integrations.

How we plan

HydroIQ runs a quarterly planning cycle. We commit at quarter resolution, not month resolution, because the gap between "we know what to build" and "the FCC test lab has a free slot" can swallow a calendar month without anyone doing anything wrong. If a quarter target moves, this page is the first place it shows.

Want updates?

The beta cohort is the closest thing we have to a public roadmap newsletter. Express interest in the beta, and we will fold you into the quarterly progress note that goes out to active participants and partners.